Satnews Daily
September 22nd, 2011

Virgin Galactic... An Unveiling For The FAITHful (Spacecraft)


[SatNews] This new facility required $8 million to build...

The Spaceship Company (TSC), the aerospace production joint venture of Sir Richard Branson’s Virgin Galactic and Scaled Composites, achieved a significant milestone in making commercial space travel a reality with today’s opening of its Final Assembly, Integration and Test Hangar, or FAITH, at Mojave Air and Space Port. The $8 million, modern, energy-efficient hangar supports the final stages of production for prime customer Virgin Galactic’s WhiteKnightTwo and SpaceShipTwo, and will add new jobs to the commercial space industry at spaceports in Mojave and New Mexico. Located on taxiway-B, FAITH is a 68,000-square-foot, LEED-certified facility that will be used primarily for the final assembly, integration and testing of TSC vehicles before they are delivered to their customers. FAITH will also be used to support major return-to-base vehicle maintenance, and serve as TSC’s operating headquarters.


FAITH completes the infrastructure needed to manufacture a fleet of TSC’s two core products: the SpaceShipTwo (SS2) sub-orbital spaceship and the WhiteKnightTwo (WK2) carrier aircraft. The facility is specifically sized to support fabrication of SS2 and WK2 with room to produce at least two of each ship at the same time. FAITH was completed within 10 months, as scheduled, and on budget by Bakersfield-based Wallace & Smith General Contractors. It is one of two facilities that TSC will use to produce commercial spacecraft. The other is a 48,000-square-foot existing building at the Mojave Air and Space Port that TSC recently upgraded to serve as the company’s fabrication and vehicle sub-assembly facility. TSC has secured options to expand the size of the FAITH facility and build an adjacent flight test hangar, as the customer base grows. The opening of FAITH also means a boost to our local economies with impact in California and New Mexico. TSC currently employs over 80 people and is looking to double its workforce within the next year, with numerous high-tech and engineering positions available in the next 90 days.