
ATK's DM-2
The first-stage solid rocket motor is designed to generate up to 3.6-million pounds of thrust at launch. Information collected from this test, together with data from the first development motor test last year, will be evaluated to better understand the performance and reliability of the design. Although similar to the solid rocket boosters that help power the space shuttle to orbit, the five-segment development motor includes several upgrades and technology improvements implemented by NASA and ATK engineers. Motor upgrades from a shuttle booster include the addition of a fifth segment, a larger nozzle throat, and upgraded insulation and liner. The motor cases are flight-proven hardware used on shuttle launches for more than three decades. The cases used in this ground test have collectively launched 59 previous missions, including STS-3, the first shuttle flight.
After further testing, the first-stage solid rocket motor will be certified to fly at temperature ranges between 40-90 degrees Fahrenheit. The solid rocket motor was built as an element of NASA's Constellation Program and is managed by the Ares Projects Office at Marshall. ATK Aerospace Systems, a division of Alliant Techsystems of Brigham City, Utah, is the prime contractor.

