Your Daily Briefing Of Satellite Industry News

 

SpaceDev Says Lunar Missions Can Be Completed for Less than $10-B

 
NASA’s plan for a series of Lunar missions is expected to cost $104 billion over 13 years but SpaceDev said this could be completed in fraction of that cost. (SpaceDev photo)

POWAY, CA, Nov. 22, 2005/Satnews Daily/ — SpaceDev (OTCBB: SPDV) has announced the results of its International Lunar Observatories Human Servicing Mission, conducted for Lunar Enterprise Corporation.

 

The study, which was completed in phases over the last three years and presented at the International Lunar Observatory Advisory Committee Workshop held this past weekend, concluded that safe, lower cost missions can be completed by the private sector using existing technology or innovative new technology expected to be available in time for the first mission.

 

NASA recently announced plans for a Lunar mission expected to cost $104 billion over 13 years. SpaceDev’s results, however, indicate a more comprehensive series of missions could be completed in a fraction of the time for one-tenth of the cost. Each mission, as envisioned by SpaceDev, would position a habitat module in Lunar orbit or on the moon’s surface. The habitat modules would remain in place after each mission and could be re-provisioned and re-used, thus building a complex of habitats at one or more Lunar locations over time.

 

“We are not surprised by the significant cost savings that our study concludes can be achieved without sacrificing safety and mission support. Since SpaceDev was founded, our projects and studies have consistently come in at significantly lower costs than those of the large aerospace companies and government agencies,” said SpaceDev founding chairman and chief executive, Jim Benson. “If we are correct about our Lunar mission cost estimates, our type of human mission could have forty people visiting the Moon for the cost of NASA’s first mission.”

 

The SpaceDev study creates a conceptual mission architecture and design for a human servicing mission to the Lunar south pole targeted for the period between 2010 and 2015 that would be low in risk and cost. The length of stay on the Moon will be seven or more days, depending on cost, practicality and other trade-offs. The study explored existing technology, technology currently under development, and proposed technology that could be developed by NASA, other countries or the private sector in time to be incorporated into the mission.

 

Recent Stories:

SpaceDev Awarded Hybrid Rocket Motor Contract

SpaceDev Reveals Concept for Dream Chaser Space Transport System

SpaceDev Net Sales Rise 82% to $2.23-M

SpaceDev Introduces Low Cost Modular Microsatellite

 
Back to the Home Page